Safe Work Method Statements
021 ELECTRICAL POWER TOOLS
046 ACCESS INVESTIGATING AIR CONDITIONING
047 DISCONNECTION OF AIR CONDITIONERS
049 INSTALL DUCTWORK CONCRETE & OR CEILING
049 (B) INSTALLING VERTICAL DUCT WORK
050 INSTALLING DUCT WORK TO UNDERSIDE OF CONCRETE
051 REPAIRING DAMAGED DUCT WORK
060 INSTALLING PVC/COPPER PIPEWORK INTO GROUND
071 INSTALLING PAIR COIL/REFRIGERATE PIPING
073 INSTALLING TOILET EXHAUST FAN
074 INSTALLING CONDENSATE FLEXI PIPING
075 INSTALLING CONDENSATE PIPING - RIGID
076 INSTALLING COPPER / PVC PIPEWORK TO CONCRETE SLAB
077 INSTALLING FCU TO CONCRETE
093E CONDUIT INSTALLATION BEFORE CONCRETE
094E INSTALLING CABLE TO CONCRETE
098E WORKING ON ENERGIZED LOW VOLTAGE EQUIPMENT
099E ISOLATION AND TESTING OF ENERGY SOURCES
100E INSTALLION OF NEW WORK IN EXISTING SWITCHBOARD
101E INSTALLATION OF NEW SWITCHBOARD CONNECTIONS
102E INSTALLATION OF SWITCHBOARDS
104E TESTING AND TAGGING ELECTRICAL EQUIPMENT
105E INSTALLING CONDUIT IN GROUND
106E INSTALLING CONDUIT WALLS AND CEILINGS
107E INSTALL CABLE AND LADDER TRAY
199E PROGRAMMING THE BMS SYSTEM